U.S. Nuclear Regulatory Commission reviewing reapproval of nuclear waste shipments route from Canada and the port of Charleston, SC to be dumped at the Savannah River Site
NRC letters of January 25,
Monitors a host of energy and nuclear issues from a public interest perspective
SRS Watch · ·
SRSW · ·
— Congress will initially keep the plutonium fuel MOX project at the shut-down funding level (of $340 million/year);
— Reports will underscore that the $17 billion MOX plant construction at SRS is not viable due to cost challenges and chronic design and construction problems;
SAVANNAH RIVER SITE WATCH
1112 Florence Street, COLUMBIA, SC 29201 | 803-834-3084 – srswatch@gmail.com
The information produced on this website is the sole property of SRS Watch unless otherwise noted and may be reproduced or quoted if credit is given to SRS Watch. Materials published on this website are for non-profit public interest purposes only. SRS Watch is a registered corporation in South Carolina and in December 2014 and has obtained non-profit 501(c)(3) public -interest organization status from the IRS. SRS Watch is responsible for all material published on this website. We strive to be accurate in all material produced. For inquiries, comments or corrections, please contact us at srswatch@gmail.com or 803-834-3084. Donations are most welcome and are tax deductible. Mailing address: Savannah River Site Watch, 1112 Florence Street, Columbia, SC 29201. This site or product includes IP2Location LITE data available from https://lite.ip2location.com.
©SRS Watch 2019 All Rights Reserved in All Media.