• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Savannah River Site

Monitors a host of energy and nuclear issues from a public interest perspective

  • Home
  • About Us
  • News
  • SRS Watch News
  • Library
    • Department of Energy
    • General Documents
    • Freedom of Information Act Documents
  • Photos
  • Show Search
Hide Search

“Unleashing Plutonium Proliferation” Report Released by SRS Watch – on DOE’s Dangerous Effort to Introduce Weapons Plutonium into the Civilian Fuel Cycle, October 31, 2025

SRSW · October 31, 2025 ·

Savannah River Site Watch news, October 21, 2025:

Report on Plutonium-Use Plans by Department of Energy and Oklo Inc Pose Unacceptable Nuclear Proliferation Risks; Program to Give Away 19.7 Tons of DOE Plutonium Must be Halted

SRS Watch Report Unleashing Plutonium Proliferation in the U.S. Holds Risks Reviews U.S. Plutonium Policies and Outlines Cost, Technical, Environmental, Political and Legal Challenge

Columbia, South Carolina – A new analysis of the U.S. Department’s plans to introduce weapons plutonium into commercial nuclear facilities, including into so-called “advanced” nuclear reactors concludes that the costly plan is unworkable and that it poses unacceptable proliferation risks and must be halted.  Plutonium, in the form of a “pit” (weapon core), is the heart of a nuclear weapon.

The hard-hitting report, by the public interest group Savannah River Site Watch, reviews effort by the company Oklo Inc, in conjunction with DOE, to break nuclear non-proliferation norms by introducing plutonium into the operation of commercial nuclear facilities.  Oklo is pursuing new facilities designed to produce plutonium fuel, operate reactors using plutonium fuel, and reprocess commercial spent fuel to remove plutonium to be used as fuel, all of which pose risks.  None of those facilities exist and none are licensed by the U.S. Nuclear Regulatory Commission (NRC), so are speculative in nature.

The U.S. abandoned its plutonium “breeder” reactor program and reprocessing decades ago in the name of nuclear non-proliferation but the Trump Administration is now damaging efforts to control the use of weapon-usable plutonium. The report highlights why the current Trump plan, which also poses technological and environmental risks, is flawed and likely to fail.

Of particular concern is that DOE has also just offered to give away 19.7 metric tons of surplus weapons plutonium – enough plutonium for more than 4000 nuclear weapons – so that it might be fabricated into fuel to be used in sodium-cooled fast reactors. With this proposal, it appears that DOE is prepared to skirt the requirements of the National Environmental Policy Act (NEPA), which has been used for two decades to review plutonium disposition options, including treating it as waste as well as the proposal to produce new plutonium “pits” (weapons cores) for nuclear warheads at Los Alamos National lab (LANL) in New Mexico and the Savannah River Site (SRS) near Aiken, South Carolina.

“The DOE proposal to give 20 tons of plutonium to the nuclear power industry and plans to introduce plutonium into reactors and nuclear facilities would severely damage U.S. nuclear nonproliferation norms if carried out,” said Tom Clements, director of Savannah River Site Watch based in Columbia, South Carolina. “Pursuit of this misguided plutonium project without proper NEPA and nonproliferation review may well unleash legal challenges to it,” Clements added.

Sections in the Unleashing Plutonium Proliferation report, authored by Clements, include:

  • Plutonium Proliferation Alarm Bells
  • 7 Metric Tons of Plutonium for Free! Includes details about DOE’s “request” for private bidders to take the weapon-usable material (produced at Hanford & Savannah River Site.)
  • Total Amount of U.S. Surplus Plutonium – Disposition Subject to NEPA Review for 3 Decades
  • Disposition of Plutonium as Waste Slowed as the Proliferation Option Emerges
  • Oklo Powerhouse based on Sodium-Cooled Experimental Breeder Reactor-II (EBR-II) but it’s Not a Plutonium “Breeder”…Yet
  • Closure of EBR-II and the U.S. Breeder Reactor Program – Is DOE/Oklo Aiming to Repeat Past Plutonium-Proliferation Mistakes?
  • Metallic Fuel Fabrication: But Where’s the Fabrication Facility Needed by 2028?
  • Let’s Just Call it Reprocessing: Plutonium Removal from Spent Fuel Key to Oklo’s Plan

When DOE cancelled the troubled program in 2018 to dispose of surplus plutonium via mixed uranium-plutonium oxide (MOX) commercial nuclear reactor fuel at the Savannah River Site, it then chose, after much NEPA analysis, to dispose of the plutonium in the Waste Isolation Pilot Plant (WIPP), the geologic plutonium waste facility in New Mexico.

Then, DOE’s National Nuclear Security Administration (NNSA) decided to convert the partially finished MOX building at SRS into a plutonium pit-production facility. That project continues though costs have skyrocketed and there are significant schedule delays but the parallel program to dispose of surplus plutonium as waste has floundered as some in the nuclear power industry now have their eyes on using the plutonium as metallic fuel in nonexistent fast reactors.  DOE stores about 20,000 plutonium “pits” at DOE’s Pantex site in Texas that some want to use as fuel in reactors modeled on the long-terminated Experimental Breeder Reactor-II (EBR-II) at Idaho National Lab (INL).

The SRS Watch report concludes that not only does the Oklo-DOE program to use plutonium in reactors pose proliferation risks but that so many components of the project don’t exist and have no cost or schedule to be built –  including a fuel fabrication facility and reactors – and that it’s unworkable.  Additionally, documents lacking detail by Oklo indicate it’s aiming to reprocess all of the country’s civilian spent fuel (removed from commercial reactors) and reprocess it (via a technique called pyroprocessing) to remove weapon-usable plutonium to be used as reactor fuel, which in itself sends the wrong message internationally.

“DOE’s commercial plutonium program is unacceptable and dangerous, will waste vast sums of taxpayer money and has little chance of success and must be terminated,” concludes Clements.

###

Unleashing Plutonium Proliferation report posted here:  Unleashing Plutonium Proliferation SRS Watch Oct 31 2025

PDF of SRS Watch news release above:  SRS Watch new release on plutonium report, October 31 2025

 

Filed Under: SRS Watch News Tagged With: MOX, nonproliferation, nuclear, Oklo, plutonium, proliferation, SRS

Primary Sidebar

Subscribe to Updates via Email

Enter your email address to subscribe to updates and receive notifications of new posts by email.

Recent Posts

  • SRS Watch Unleashes Comment Against DOE Effort to Avoid NEPA for “Advanced Nuclear Reactors,” March 4, 2026
  • GAO: SRS Plutonium Bomb Plant Delays Mount and Costs Soar, Per Usual DOE Methodology, Feb. 26, 2026 report
  • Paddle & Boogie to Stop the SRS Plutonium Bomb Plant, Augusta, GA Canal, March 28, 2026, with Music
  • Workers at SRS Plutonium Bomb Plant almost Sliced to Ribbons by Robot “Hydroblasting” External Wall: DOE & DNFSB Reports
  • Plutonium Shipment Secrecy – Ripe for Comments in the Plutonium-Pit-Production Draft Programmatic EIS in May 2026

Categories

  • Events
  • Latest News
  • SRS Watch News

Archives

  • March 2026
  • February 2026
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • November 2022
  • October 2022
  • September 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014

SAVANNAH RIVER SITE WATCH
1112 Florence Street, COLUMBIA, SC 29201  | 803-834-3084  – srswatch@gmail.com

Footer

The information produced on this website is the sole property of SRS Watch unless otherwise noted and may be reproduced or quoted if credit is given to SRS Watch. Materials published on this website are for non-profit public interest purposes only. SRS Watch is a registered corporation in South Carolina and in December 2014 and has obtained non-profit 501(c)(3) public -interest organization status from the IRS. SRS Watch is responsible for all material published on this website. We strive to be accurate in all material produced. For inquiries, comments or corrections, please contact us at srswatch@gmail.com or 803-834-3084. Donations are most welcome and are tax deductible. Mailing address: Savannah River Site Watch, 1112 Florence Street, Columbia, SC 29201. This site or product includes IP2Location LITE data available from https://lite.ip2location.com.

©SRS Watch 2019  All Rights Reserved in All Media.