“ARIES Oxide Production Program Dilute and Dispose LCCE Overview,
Material Management and Minimization Program”
Los Alamos National Laboratory / Pit Disassembly and Processing
Los Alamos, September 11, 2018, document linked here
Production Assumption – Increase LANL throughput to 400
Kg/year by FY25 with existing equipment and to 1500 Kg/year
by FY33 with a new suite of equipment in one additional room
The overall schedule was developed to meet the overall
throughput levels to achieve completion of LANL Dilute and
Dispose operations by 2045.