“DOE Ignores COVID-19 Threat, Diverts Resources to Planning for Nuclear War by Releasing Draft Environmental Study on SRS Plutonium Bomb Plant (PBP)”
Today, in the middle of the growing coronavirus pandemic, the U.S. Department of Energy ignored the real national crisis and irresponsibly shifted its focus to planning for nuclear war, revealing plans to construct a Plutonium Bomb Plant (PBP) at the Savannah River Site (SRS) in South Carolina.
DOE’s semi-autonomous National Nuclear Security Administration (NNSA) today formally released the Draft Environmental Impact Statement for Plutonium Pit Production at the Savannah River Site in South Carolina, whose proposed action is to establish the production of plutonium “pits” (nuclear warhead cores) at SRS at a rate of up to 125 pits per year, with at least 50 pits per year by 2030 as the stated objective for now.
Conversely, the “No Action Alternative” in the draft EIS is to not establish pit production at SRS and instead “utilize the capabilities at [the Los Alamos National Laboratory] to meet the nation’s long-term needs for pit manufacturing,” which NNSA defines as being at least 80 pits per year.
NNSA’s unjustified proposal drew strong opposition from Nuclear Watch New Mexico, Tri-Valley Communities Against a Radioactive Environment and Savannah River Site Watch, public interest organizations located near DOE nuclear weapons sites. In addition, the organizations view NNSA’s proposed 45-day comment period as woefully insufficient given the coronavirus epidemic and will pressure NNSA for an extended deadline.
Full news release posted here: SRS-EIS-PR-April-3-20-Plutonium-Bomb-Plant
On EIN Newswire here: https://www.einpresswire.com/article/513733263/doe-ignores-covid-19-threat-plans-for-nuclear-war-by-releasing-draft-environmental-study-on-srs-plutonium-bomb-plant
Photo: Partially constructed MOX plant, which DOE wants to convert into an unjustified Plutonium Bomb Plant (PBP), photo by High Flyer
DOE ad on “virtual hearing” on April 30: