“Letter: Plutonium pits aren’t needed”
Aiken (South Carolina) Standard, December 16, 2019
“According to a Dec. 11 story in the Aiken Standard, the 2020 National Defense Authorization Act (NDAA) authorizes the production of 50 plutonium pits per year at the Savannah River Site. These are nuclear bomb cores. Turning SRS into a Plutonium Bomb Plant is both ill-advised and unnecessary.”
read full letter: , https://www.aikenstandard.com/opinion/letter-plutonium-pits-aren-t-needed/article_424ddd12-1eee-11ea-b3bb-5ff139e9b94b.html