Low quality obfuscation from DOE – which doesn’t answer what happened to the “missing” 1/2 tonne of plutonium – was it shipped to Pantex in Texas or another DOE site, or not?
“Energy Department Statement on Plutonium Shipments [from SRS] to Nevada” – January 31, 2019
https://www.energy.gov/articles/energy-department-statement-plutonium-shipments-nevada
WASHINGTON, D.C. – The Department of Energy’s National Nuclear Security Administration (DOE/NNSA) is committed to protecting the health, safety, and security of the public at all of our sites as we conduct our important national security missions. The recent plutonium shipments to the Nevada National Security Site were undertaken to comply with an order issued by the U.S. District Court in South Carolina.
It is inaccurate to state that the Members of the Nevada delegation were not informed of this movement. The Department of Energy was as transparent as operational security would permit. Efforts were made to ensure that Members of Congress representing the states involved were notified of the planned movement ahead of time, as early as August 2018 when NNSA publicly released the plan in a Supplement Analysis. Since then, NNSA confirmed that it was “actively engaged” in removing one metric ton of plutonium from South Carolina to Nevada, Texas, and New Mexico.**
It is also inaccurate to characterize this material as “waste”. This material is essential for maintenance of the U.S. weapons stockpile, and is handled with the highest standards for safety and security. NNSA routinely ships this type of material between its sites as part of our national security missions and has done so safely and securely for decades.
###