New Report by SRS Watch: Restart of Failed Nuclear Reactor Project in S.C. Faces Unreviewed Challenges, August 20, 2025

SRSW · August 20, 2025 ·

V.C. Summer Nuclear Reactor Restart Idea Faces Daunting Challenges, According to New Report by Nuclear Policy Expert who Led Public-Interest Intervention before  the S.C. Public Service Commission

Rhetoric of Politicians Blindly Touting Project Restart, like Senator Graham, Rings Hollow Absent Thoughtful Analysis; Customers Paying 5.22% of Monthly Bill for V.C. Summer Debacle

Columbia, SC – The proposal to restart the failed nuclear reactor construction project in South Carolina faces a host of unexamined challenges, according to a just-released report. The report, prepared by the nuclear policy expert who led the intervention against the project since its inception in 2008 through its collapse and termination in the face of ratepayer outrage 2017, outlines major stumbling blocks to the revival of the nation’s most shocking failure of a nuclear reactor construction project in the United States in the 21st century.

The V.C. Summer project involved the botched attempt by now-defunct South Carolina Electric & Gas (SCE&G) to construct two large Westinghouse AP1000 nuclear reactors 2 – units 2 & 3 – 25 miles north of Columbia, South Carolina. Over $10 billion was wasted on the construction of project.  Its abrupt termination was one of the most impactful and costly nuclear construction-project collapses in U.S. history, which was the death knell for the so-called “nuclear renaissance” in the U.S. Customers were hit hard and are still left holding the bag with nothing in return for a reported $2 billion payment so far, for financing costs, an amount that grows daily. Though far-fetched, project restart is now being discussed.

The report – presenting 14 unanalyzed challenges to the restart idea, was prepared by the Columbia-based public-interest, non-profit group Savannah River Site Watch – is titled Economic, Technical and Regulatory Challenges Confound Restart of the Terminated V.C. Summer Nuclear Reactor Construction Project in South Carolina. The 24-page report was written by Tom Clements, director of SRS Watch, who led interventions before the PSC by the environmental group Friends of The Earth beginning in 2008 and running through the bankruptcy of SCE&G and its takeover by Dominion Energy South Carolina in January 2019.

“As the public was so abused during the V.C Summer construction project, they now deserve a voice in raising concerns about proposals concerning rebirth of the project in which they still have financial ownership and that’s for whom this report speaks” said Clements. “We reveal in the report that Dominion ratepayers are right now paying 5.22% of the bill for the terminated project and are paying, since 2019, an additional $2.8 billion over 20 years.  The restart effort could once again saddle customers with additional massive costs if VCSummer2.0 proceeds.”

The 5.22% monthly rate hidden in the Dominion monthly bill was revealed in a Freedom of Information Act document provided by the S.C. Office of Regulatory Staff to SRS Watch on August 7, 2025. In January 2019, the S.C. Public Service Commission ordered Dominion customers to pay an additional $2.8 over the next 20 years for the cost of the bungled project. That monthly fee should be eliminated and consumer investment rebated, especially if restart is pursued, according to SRS Watch.

Themes covered in the “restart challenges” report include:

  • Nuclear Advisory Council restart report not a reliable guidepost;
  • Nuclear Regulatory Commission license terminated in 2019, hard to regain a new license;
  • Reestablishing NRC certification for equipment will be difficult;
  • Environmental permits must be secured anew or renewed;
  • Unclear how much equipment remains and if it’s to be resold for reuse or just scrap;
  • Dominion and Santee Cooper not interested in involvement in restart;
  • Westinghouse plans for new AP1000s unclear, rhetoric might not be accurate;
  • Cost and schedule of new Westinghouse AP1000s unclear; Last-of-a-Kind (LOAK) reactor?
  • Ratepayers in South Carolina could be put on the hook again;
  • C. Public Service Commission and Dominion ratepayers will be involved, can’t be sidelined;
  • Federal rhetoric supporting nuclear power won’t carry the day or overcome big obstacles;
  • Reactor restart fails to secure funds or protection from South Carolina legislature;
  • Highly radioactive spent fuel at new units a challenge;
  • When will the community near V.C. Summer be consulted?

According to Clements, numerous show stoppers exist to project restart. It’s quite telling that the earlier project owners, Dominion Energy, which owned 55% of the project and owns the V.C. Summer site where a single operating reactor is now located, and Santee Cooper, originally owning 45% of the project, have no interest in pursuing project restart.

“No amount of ill-informed restart boosterism by Senator Lindsey Graham, Governor Henry McMaster or Secretary of Energy Chris Wright can overcome a host of economic, technical and political challenges facing the project.  I urge politicians to cool down the bluster and unleash some common sense regarding the restart idea and review the challenges,” said Clements.

Equipment and components from the canceled projects still sit amongst overgrown vegetation at the reactor site.  Major components such as the reactor vessels and steam generators, as well as the unfinished concrete reactor buildings, have been sitting exposed to the weather and degrading in the environment for over 8 years.

Now, the South Carolina Public Service Authority, known as Santee Cooper, which took control of the equipment in 2018, has floated the idea to sell off equipment sitting at the site or to actually revive the construction project with the aim to finish one or both of the reactors and place them in service.

After the project’s approval in January 2009 by the South Carolina Public Service Commission, it quickly descended into a calamitous series of cost overruns, schedule delays, design and construction problems, nine rate hikes for customers and false testimony to regulatory bodies about the project’s schedule. Two SCE&G officials and two Westinghouse officials were eventually convicted of felonies after the abrupt termination of the debacle on July 31, 2017.

The idea to restart the project was floated in September 2024 by a state-funded nuclear industry booster organization known as the South Carolina Nuclear Advisory Council. The cursory report by that entity stimulated much discussion by politicians and the media, many of whom were ill informed and not familiar with details of the project’s failure in 2017 nor aware of the hurdles now facing project reactivation or sale of stored equipment.

On January 22, 2025, Santee Cooper issued a “request for proposals” “seeking proposals to acquire and complete, or propose alternatives, for two partially constructed generating units at the V.C. Summer Nuclear Station in Jenkinsville, S.C.”  On May 6, 2025, Santee Cooper said it has received responses to the RFP but has not revealed from whom the proposals came nor what their interest in the site is. Short of restart, aging equipment at the site could be sold off.

The well-researched “restart challenges” report is being released now as Santee Cooper is in the midst of reviewing any restart or equipment-sales proposals that were submitted.  Both Santee Cooper and bidding entities must take into consideration the due diligence that SRS Watch is now conducting on behalf of the public, according to Clements.  It has earlier been reported that Santee Cooper would make a decision on equipment sale in August 2025 but that date has likely drifted.

“We aim to stimulate a much more informed dialogue about problems facing V.C. Summer project restart and encourage politicians, the media and bidding entities to consider the challenges we have outlined and respond to them,” said Clements. “Continued silence by project boosters about the challenges that exist will not garner good will by a public that was badly burned in the first go-round by construction problems and massive cost overruns that utility executives attempted to fob off on ratepayers.”

###

The SRS Watch report dated August 19, 2025, Economic, Technical and Regulatory Challenges Confound Restart of the Terminated V.C. Summer Nuclear Reactor Construction Project in South Carolina, containing a host of supporting citations and links, is posted here: https://srswatch.org/wp-content/uploads/2025/08/VC-Summer-restart-challenges-report-Clements-Aug-25-2025.pdf

—-

SRS Watch news release on EIN Presswire, August 20, 2025: https://www.einpresswire.com/article/841254582/new-report-reveals-problems-face-restart-of-canceled-v-c-summer-nuclear-reactor-construction-project-in-south-carolina

Report filed in Dominion Energy South Carolina Integrated Resource Plan (IRP) 2025 Update docket, Docket 2025-9-E, with South Carolina Public Service Commission:

https://dms.psc.sc.gov/Attachments/Matter/8674a817-92e3-43b7-8f6d-d8cfe93175f1

Report filed in Santee Cooper 2024 IRP docket (not updated as of August 2025), Docket 2024-18-E, with SC PSC:

https://dms.psc.sc.gov/Attachments/Matter/de35e705-a179-493f-9320-11f9128a16fa

Photos: VC Summer units 2 & 3 & V.C. Summer units 2 & 3 in  foreground and Dominion Energy’s operating unit 1 in background (by lake), ©High Flyer

Filed Under: SRS Watch News

Primary Sidebar

Subscribe to Updates via Email

Enter your email address to subscribe to updates and receive notifications of new posts by email.

Recent Posts

  • SRS Watch Unleashes Comment Against DOE Effort to Avoid NEPA for “Advanced Nuclear Reactors,” March 4, 2026
  • GAO: SRS Plutonium Bomb Plant Delays Mount and Costs Soar, Per Usual DOE Methodology, Feb. 26, 2026 report
  • Paddle & Boogie to Stop the SRS Plutonium Bomb Plant, Augusta, GA Canal, March 28, 2026, with Music
  • Workers at SRS Plutonium Bomb Plant almost Sliced to Ribbons by Robot “Hydroblasting” External Wall: DOE & DNFSB Reports
  • Plutonium Shipment Secrecy – Ripe for Comments in the Plutonium-Pit-Production Draft Programmatic EIS in May 2026

Categories

  • Events
  • Latest News
  • SRS Watch News

Archives

  • March 2026
  • February 2026
  • November 2025
  • October 2025
  • September 2025
  • August 2025
  • July 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • March 2023
  • February 2023
  • January 2023
  • November 2022
  • October 2022
  • September 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • June 2017
  • May 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • February 2016
  • January 2016
  • December 2015
  • November 2015
  • October 2015
  • September 2015
  • August 2015
  • July 2015
  • June 2015
  • May 2015
  • April 2015
  • March 2015
  • February 2015
  • January 2015
  • December 2014
  • November 2014
  • October 2014
  • September 2014
  • August 2014
  • July 2014
  • June 2014
  • May 2014
  • April 2014
  • March 2014

SAVANNAH RIVER SITE WATCH
1112 Florence Street, COLUMBIA, SC 29201  | 803-834-3084  – srswatch@gmail.com

Footer

The information produced on this website is the sole property of SRS Watch unless otherwise noted and may be reproduced or quoted if credit is given to SRS Watch. Materials published on this website are for non-profit public interest purposes only. SRS Watch is a registered corporation in South Carolina and in December 2014 and has obtained non-profit 501(c)(3) public -interest organization status from the IRS. SRS Watch is responsible for all material published on this website. We strive to be accurate in all material produced. For inquiries, comments or corrections, please contact us at srswatch@gmail.com or 803-834-3084. Donations are most welcome and are tax deductible. Mailing address: Savannah River Site Watch, 1112 Florence Street, Columbia, SC 29201. This site or product includes IP2Location LITE data available from https://lite.ip2location.com.

©SRS Watch 2019  All Rights Reserved in All Media.